√在线天堂中文最新版网,97se亚洲综合色区,国产成人av免费网址,国产成人av在线影院无毒,成人做爰100部片

×

load measuring造句

"load measuring"是什么意思   

例句與造句

  1. Load measuring of powered supports with magnetoelastic stress sensor
    磁彈性應(yīng)力傳感器檢測(cè)支架載荷試驗(yàn)研究
  2. Simulated load measuring of large power gearbox based on virtual instrument
    基于虛擬儀器的大功率減速器模擬加載測(cè)控
  3. Research of load measuring device of oil film bearing used in high - speed wire rolling mill
    高線軋機(jī)油膜軸承載荷特性測(cè)試裝置研究
  4. Auto - loading measuring control system for liquid production in train loading crane system
    定量自動(dòng)裝車技術(shù)在液態(tài)類物料鶴管裝車系統(tǒng)中的應(yīng)用
  5. Through finite element calculation , the internal force peak value and displacement peak value of different loading measures are compared
    通過有限元分析計(jì)算,將一次施加預(yù)應(yīng)力與多次施加預(yù)應(yīng)力的內(nèi)力峰值與位移峰值進(jìn)行了比較。
  6. It's difficult to find load measuring in a sentence. 用load measuring造句挺難的
  7. Its test specimens are four r . c hollow shear walls with vertical seams ; they have different heights and two loading measures . firstly , studies the stress distribution and deformation of the shear wall in elastic phase with ansys limited element program
    本課題為帶豎縫鋼筋砼空心剪力墻板抗震性能試驗(yàn)研究,試驗(yàn)的對(duì)象為四個(gè)不同剪跨比和加載條件的帶豎縫鋼筋砼空心剪力墻板。
  8. By the research about the equipment long time , we have advanced and designed a set of staticly measuring weight automatic stepless adjustment empty and load equipment . the static measuring weight automatic stepless empty - load measures the vehicle load in static , then records the weight as the gist of the next brake
    本文所述的靜測(cè)重?zé)o級(jí)自動(dòng)空重車調(diào)整裝置,它采用靜測(cè)重方式實(shí)現(xiàn)載重信號(hào)的采集,并將所采集的信號(hào)進(jìn)行記憶,為輸出制動(dòng)壓力提供依據(jù)。
  9. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given . the adding load equipment , measuring apparatus placed , measuring point established is detailed . adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it
    重點(diǎn)介紹了外伸端板高強(qiáng)螺栓連接的實(shí)驗(yàn)過程及實(shí)驗(yàn)分析結(jié)果,介紹了各組試件的形狀尺寸、加載裝置、測(cè)量?jī)x器安放、測(cè)點(diǎn)的布置等;給出加載方式及測(cè)出的m -曲線;計(jì)算出試驗(yàn)節(jié)點(diǎn)的初始剛度;推導(dǎo)水平集中力作用下單跨門式剛架考慮節(jié)點(diǎn)半剛性的側(cè)移計(jì)算公式。
  10. Secondly , by low - cycle and reverse horizontal loading test , their properties including strength property , deformation property and energy property are studied . we study the loading characteristic values ; the property of hysteretic curve and skeleton - frame curves ; the ductility property and stiffness degradation . at last we analyze the destroy principle and affection reasons of hollow shear wall of r . c with vertical seams in different height and loading measures , we also give the bearing capability calculation formulas and design advises for new type hollow shear wall of r . c
    首先運(yùn)用ansys有限元程序分析彈性階段水平外荷載施加后,帶豎縫鋼筋砼空心剪力墻板內(nèi)應(yīng)力分布及變形情況,再在試驗(yàn)數(shù)據(jù)的基礎(chǔ)上,研究低周反復(fù)水平加載條件下,各試件的強(qiáng)度、變形、能量特性;各試件的荷載特征值;各試件的滯回曲線、骨架曲線;延性及剛度退化等參數(shù);最后,分析了不同剪跨比和加載條件的帶豎縫鋼筋砼空心剪力墻板的破壞機(jī)理和承載力影響因素,并給出不同剪跨比和加載條件的帶豎縫鋼筋砼空心剪力墻板承載力計(jì)算公式及設(shè)計(jì)建議。
  11. The relationship between the load measured by strain method and the load calculated according to flight parameters and the wind tunnel test data has been investigated in this thesis . the result showed that the calculation load based on the flight parameters and wind tunnel test data is acceptable in subsonic speed and gets good agreement , with the load measured by strain method
    本文研究了采用應(yīng)變法實(shí)測(cè)載荷和根據(jù)飛行實(shí)測(cè)參數(shù)和風(fēng)洞實(shí)驗(yàn)數(shù)據(jù)計(jì)算載荷之間的關(guān)系,研究表明采用飛行實(shí)測(cè)參數(shù)和風(fēng)洞實(shí)驗(yàn)的數(shù)據(jù)計(jì)算載荷在亞音速范圍內(nèi)是可行的,與采用應(yīng)變法實(shí)測(cè)載荷是吻合的。
  12. The standard in bridges " designing load in xuanhua - datong speedway is auto - super 20 , trailer - 120 . because of transiting carrying coal vehicle mostly , investigating and measuring all vehicles carrying coal in 109 and analyzing and checking strength and intension of new bridges . in this way , ensuring to advance loading measure of over load and assuring safely operation in bridges according to the standard in bridges " designing load
    宣大高速公路橋梁設(shè)計(jì)荷載標(biāo)準(zhǔn)為汽車?超20級(jí),掛? 120 ,公路建成后主要通行運(yùn)煤重載車輛,為此對(duì)現(xiàn)有高速公路旁全部的109國(guó)道運(yùn)煤車輛進(jìn)行調(diào)研、量測(cè),并以此對(duì)新橋梁結(jié)構(gòu)受力及強(qiáng)度進(jìn)行了分析及驗(yàn)算,以確定對(duì)重載車輛提出發(fā)載措施,保證按高速公路橋梁設(shè)計(jì)荷載標(biāo)準(zhǔn)設(shè)計(jì)的橋梁能夠安全運(yùn)營(yíng)。

相鄰詞匯

  1. "load master"造句
  2. "load matching"造句
  3. "load matrix"造句
  4. "load me up"造句
  5. "load measurement"造句
  6. "load measuring device"造句
  7. "load member"造句
  8. "load memory"造句
  9. "load message"造句
  10. "load meter"造句
桌面版繁體版English日本語(yǔ)

Copyright ? 2025 WordTech Co.